Georgia Department of Transportation continues to improve highway infrastructure throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue this weekend and next week, Saturday, August 11 through Friday, August 17.

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones, pay attention and watch for workers.

Lane closures by county are scheduled as follows:

Bryan County 
SR 25/US 17 at Ogeechee River 
Weekend Single Lane Closures for Bridge Rehabilitation Work
Starting August 17th through Monday September 30th
Friday, Saturday and Sunday nights 6 p.m. through 6 a.m.                                                                                                                                                   
Bryan and Liberty Counties
Interstate 95 between Mileposts 66 to 86
Nightly double lane closures for paving operations
Saturday through Friday 7 p.m. until 7 a.m.

Camden County 
I-95 Southbound Middle Lane from MP 0 to MP 7
Single and Double Lane closures for paving operations
Single Lane Closures – Sunday through Thursday 7 p.m. until 7 a.m.
Double Lane Closures – Sunday through Thursday 9 p.m. until 5 a.m.      

Interstate 95  between Mileposts (MP) 12 to 15
Single lane closures for vegetation removal operations
Saturday 8 a.m. until 5 p.m. then project should be completed                                                                                              

Chatham County 
County Road 787 (Island Expressway) between Oatland Island Road to Elba Island Road
Median construction/paving operations for Bridge Replacement Project
Single lane closures in both directions
Monday through Friday 9 a.m. until 3 p.m. and 7 p.m. until 6 a.m.
Weekends 7 p.m. Friday through 6 a.m. Monday

US 80 between Stagecoach Road and Old Osteen Road
Lane shift with speed reduction required for Jimmy Deloach Extension Project
(June 25th through September 30th )

I-95 North and South Bound Milepost 99 and the GA/SC Bridge
Shoulder and Single Lane closures for cleaning for placement of fog seal
Friday through Sunday 9 a.m. until 3 p.m.
Interstate 516
Lane closures for concrete repairs
Nightly 9 p.m. and 6:00 a.m. Monday through Thursday
Weekend closures will be from 9 p.m. Friday to 6 a.m. Monday

SR 204/Abercorn Street from Rio Road to 37th Street
Slow moving lane closures for thermoplastic striping
Monday through Friday 9 a.m. through 8:30 p.m.

Glynn County
Routine Bridge Inspection on SR 303 and SR 520
Lane Closures with flagging operations
Monday through Wednesday 8 a.m. until 4:30 p.m.
SR 303 bridges at MP 1.16  and MP 4.42 between US 82 and Old Jesup Highway
SR 520 bridge on Jekyll Island Road at MP 24.66 last bridge before Jekyll Island

Ware County
US 1 near Dixie Union
Railroad overpass north of Dixie Union and two bridges south of Dixie Union
Weekend Single Lane Closures for Bridge Rehabilitation Work
Starting Friday, August 17th through Monday September 30th
Friday, Saturday and Sunday nights 6 p.m. through 6 a.m.

Information from GDOT

Print Friendly, PDF & Email

LEAVE A REPLY

Please enter your comment!
Please enter your name here